PUBLISHED: 10 Jul 2024 at 04: 14
NEWSPAPER SECTION: News
The Department of Rural Roads ( DRR ) reports that Nakhon Pathom province will soon have a new bridge over the Nakhon Chaisri River and that it will ease traffic and boost the local economy.
Officially named” Ngiew Rai-Sampathuan Bridge”, it links tambon Ngiew Rai with tambon Sampathuan in Nakhon Chaisri district, DRR director-general Apirat Chaiwongnoi said.
The bridge was constructed to provide a new way to transport items away from the city center.
The two-lane gate, which is nine feet wide and 400 feet long, cost 114 million baht to develop. The composition is made of reinforced concrete, while the street surface is asphalt.
According to Mr. Apirat, the gate is anticipated to cut at least two kilometers between the two tambons, which will aid in transportation, particularly when delivering local produce to the market.